English–Chinese reference · Aerospace & UAV

Corrosion Prevention and Control腐蚀预防与控制

Corrosion prevention and control is a maintenance program that manages structural corrosion over an aircraft’s service life through scheduled inspections, drain path checks, protective treatments, and repair follow-up. It appears in maintenance planning documents, airframe task cards, and structural repair records; the program combines cleaning, sealing, and inspection thresholds for lap joints, bilge areas, and dissimilar-metal contact to keep corrosion from affecting airworthiness or structural integrity.

Angel Translation editorial reference · Confirm the rendering against your source and approved project terminology.

TERM REFERENCE · PROJECT CHECK
EnglishCorrosion Prevention and Control
简体中文腐蚀预防与控制
DomainAerospace & UAV

Check source meaning → confirm the preferred term → record approved variants and references.

Where this term appears

This term appears in structural inspection programs, corrosion control manuals, and airframe maintenance task cards. Translators encounter it when localizing operator maintenance schedules, repair instructions, and non-routine task entries after inspections find corrosion, including level definitions, repeat interval rules, and post-repair protection requirements for critical structure such as lap joints and floor beams.

Translation checks

A common error is translating “prevention and control” as if it covers only cleaning or painting, losing the program-level inspections and repair limits. Another mistake is translating corrosion levels as simple light/moderate/severe labels without preserving the technical criteria for blending, stop-drilling, or allowable material removal, which can lead to incorrect repair decisions.

Keep the term aligned across your files

Check procedure sequence, part names, limits and cautions against the supplied references. Applicable aviation or market requirements depend on the product and project pathway.

Provide approved terms and previous translations with the source files. Agree how variants, ambiguous wording and revisions will be reviewed. Terminology maintenance and any termbase handback are confirmed in the project scope. See the 8-step AI + expert workflow.

Related document experience

Published scope shows related industry experience; it does not confirm that this specific term was used or reviewed in the project.

Working on aerospace & uav documentation?

Include the source and target languages, file types, intended use, deadline and any approved termbase. Agree handling before sending sensitive files. Acknowledged in 4 hours, quoted in 24.

Prepare an inquiry email →Aerospace & UAV solutions →File handling →

A glossary entry is not an official standard or evidence of regulatory acceptance. Confirm current requirements for your project separately.