English–Chinese reference · Aerospace & UAV

Empennage尾翼

Empennage is the complete tail assembly of an aircraft, typically including the horizontal stabilizer, elevator, vertical stabilizer, and rudder; it provides stability and control in pitch and yaw. In aerospace documentation, it appears in airframe descriptions, maintenance manuals, structural repair documents, and illustrated parts catalogs where the tail structure and its control surfaces are identified, often with reference to fuselage stations or frame numbers.

Angel Translation editorial reference · Confirm the rendering against your source and approved project terminology.

TERM REFERENCE · PROJECT CHECK
EnglishEmpennage
Chinese (Simplified)尾翼
DomainAerospace & UAV

Check source meaning → confirm the preferred term → record approved variants and references.

Where this term appears

Empennage appears in airframe description documents, structural repair manuals, illustrated parts catalogs, and maintenance training charts. Translators should not reduce it to a generic 'tail,' because the term denotes an engineering assembly; they also need to keep subcomponent names such as stabilizer, elevator, and rudder consistent with callouts and part numbers.

Translation checks

A frequent mistake is translating empennage as a vague 'tail section' or 'rear body,' which can be confused with the aft fuselage in structural repair instructions. Another is inconsistent naming of the stabilizer, elevator, and rudder, making it hard to match parts catalog entries with repair steps and illustrated callouts.

Keep the term aligned across your files

Check procedure sequence, part names, limits and cautions against the supplied references. Applicable aviation or market requirements depend on the product and project pathway.

Provide approved terms and previous translations with the source files. Agree how variants, ambiguous wording and revisions will be reviewed. Terminology maintenance and any termbase handback are confirmed in the project scope. See the 8-step AI + expert workflow.

Working on aerospace & uav documentation?

Include the source and target languages, file types, intended use, deadline and any approved termbase. Agree handling before sending sensitive files. Acknowledged in 4 hours, quoted in 24.

Prepare an inquiry email →Aerospace & UAV solutions →File handling →

A glossary entry is not an official standard or evidence of regulatory acceptance. Confirm current requirements for your project separately.