English–Chinese reference · Aerospace & UAV

No-Fly Zone禁飞区

A no-fly zone is a defined volume of airspace in which aircraft or unmanned aircraft are prohibited from operating unless specific permission applies. In aerospace localization it appears in airspace restriction notices, unmanned traffic management documentation, geofencing databases, and regulatory content that distinguishes prohibited, restricted, and temporary flight limitation areas, often using the term alongside restricted zone and temporary flight restriction.

Angel Translation editorial reference · Confirm the rendering against your source and approved project terminology.

TERM REFERENCE · PROJECT CHECK
EnglishNo-Fly Zone
Chinese (Simplified)禁飞区
DomainAerospace & UAV

Check source meaning → confirm the preferred term → record approved variants and references.

Where this term appears

It appears in drone operations manuals, airspace authorization requests, geofencing configuration files, and UTM platform interfaces. Translators must ensure that warnings about prohibited airspace are clear in local language, because a pilot or operator may rely on localized labels to avoid entry. The term is also used in preflight planning and in regulatory guidance for operations near airports, borders, or security-sensitive sites.

Translation checks

A common mistake is translating no-fly zone as a generic “flight-prohibited area” without distinguishing it from restricted or danger areas, which may have different entry criteria and approval processes. Another is softening the prohibition in user-facing text, for example by using “should avoid,” which can make an operational restriction sound optional and increase airspace violation risk.

Keep the term aligned across your files

Check procedure sequence, part names, limits and cautions against the supplied references. Applicable aviation or market requirements depend on the product and project pathway.

Provide approved terms and previous translations with the source files. Agree how variants, ambiguous wording and revisions will be reviewed. Terminology maintenance and any termbase handback are confirmed in the project scope. See the 8-step AI + expert workflow.

Working on aerospace & uav documentation?

Include the source and target languages, file types, intended use, deadline and any approved termbase. Agree handling before sending sensitive files. Acknowledged in 4 hours, quoted in 24.

Prepare an inquiry email →Aerospace & UAV solutions →File handling →

A glossary entry is not an official standard or evidence of regulatory acceptance. Confirm current requirements for your project separately.