Downtime is the time interval in which a machine, production line, or system cannot perform its intended production function, covering both planned events such as changeovers and preventive maintenance and unplanned events such as breakdowns and material shortages. In manufacturing documentation, downtime appears in shift reports, OEE calculations, maintenance logs, service histories, and continuous-improvement records where availability, lost output, and response times are measured.
Angel Translation editorial reference · Confirm the rendering against your source and approved project terminology.
Check source meaning → confirm the preferred term → record approved variants and references.
Downtime appears in localization for maintenance software dashboards, shift reports, OEE tracking tools, service contracts, and operator manuals. Translators working on industrial IoT or MES interfaces often render column headers, alarm messages, and report labels where planned downtime, unplanned downtime, and related reliability metrics must remain distinct across languages and reporting regions.
A common error is translating downtime simply as 'standstill' or 'idle time,' which blurs the difference between planned and unplanned losses. Another mistake is using a single generic term in dashboards where short localized labels depend on context; this can distort OEE figures and maintenance reports because not every stoppage counts as downtime in the same way.
Check equipment names, units, safety instructions and interface labels against the source and approved references. Confirm any market-specific document requirements separately.
Provide approved terms and previous translations with the source files. Agree how variants, ambiguous wording and revisions will be reviewed. Terminology maintenance and any termbase handback are confirmed in the project scope. See the 8-step AI + expert workflow.
Construction-machinery technical documentation.
Read the published project →Tire-technology documentation across multiple Asian languages.
Read the published project →Published scope shows related industry experience; it does not confirm that this specific term was used or reviewed in the project.
Include the source and target languages, file types, intended use, deadline and any approved termbase. Agree handling before sending sensitive files. Acknowledged in 4 hours, quoted in 24.
Prepare an inquiry email →Smart Manufacturing solutions →File handling →A glossary entry is not an official standard or evidence of regulatory acceptance. Confirm current requirements for your project separately.