A jig is a production device that holds a workpiece in position and guides a tool, such as a drill or tap, to ensure repeatable location during machining or assembly. Work instructions, tooling lists, setup sheets, and quality documents use the term where jigs must be distinguished from fixtures and other workholding equipment, and where workshop naming must remain unambiguous.
Angel Translation editorial reference · Confirm the rendering against your source and approved project terminology.
Check source meaning → confirm the preferred term → record approved variants and references.
Jig appears in machining setup sheets, assembly work instructions, tooling purchase orders, and training manuals for operators. Translators often encounter it in tables listing jig numbers, locating points, clamping sequence, and tool guide positions, where terminology must match the workshop naming system. Some languages have a single term for both jig and fixture, so source distinction is easy to lose.
A common mistake is using the same translation for jig and fixture, even though a jig often guides the tool while a fixture mainly locates and supports the workpiece. In work instructions, this can lead an operator to select the wrong tooling or clamping method. The error also propagates into bills of materials and setup sheets.
Check equipment names, units, safety instructions and interface labels against the source and approved references. Confirm any market-specific document requirements separately.
Provide approved terms and previous translations with the source files. Agree how variants, ambiguous wording and revisions will be reviewed. Terminology maintenance and any termbase handback are confirmed in the project scope. See the 8-step AI + expert workflow.
Construction-machinery technical documentation.
Read the published project →Tire-technology documentation across multiple Asian languages.
Read the published project →Published scope shows related industry experience; it does not confirm that this specific term was used or reviewed in the project.
Include the source and target languages, file types, intended use, deadline and any approved termbase. Agree handling before sending sensitive files. Acknowledged in 4 hours, quoted in 24.
Prepare an inquiry email →Smart Manufacturing solutions →File handling →A glossary entry is not an official standard or evidence of regulatory acceptance. Confirm current requirements for your project separately.