English–Chinese reference · Smart Manufacturing

Single-Minute Exchange of Die快速换模

Single-Minute Exchange of Die is a setup-reduction method that aims to shorten equipment changeover time to a single-digit number of minutes, ideally under ten. In manufacturing documentation, the term appears in changeover procedures, lean training modules, and quick-change tooling descriptions, where it is used to distinguish internal setup tasks performed while a machine is stopped from external tasks that can be done while it runs.

Angel Translation editorial reference · Confirm the rendering against your source and approved project terminology.

TERM REFERENCE · PROJECT CHECK
EnglishSingle-Minute Exchange of Die
Chinese (Simplified)快速换模
DomainSmart Manufacturing

Check source meaning → confirm the preferred term → record approved variants and references.

Where this term appears

Translators encounter SMED in setup sheets, lean event reports, and training videos for press or molding operations. The text often includes terms like internal setup, external setup, and changeover checklist; translators must preserve the contrast between activities done with the machine stopped and those done while it is running because the entire method depends on that distinction.

Translation checks

A frequent mistake is translating “single-minute” literally as “one-minute changeover,” overpromising a specific duration that the method does not require. Another error is collapsing internal and external setup into a generic “setup,” which hides the core insight of moving work from stopped time to running time and weakens the procedure.

Keep the term aligned across your files

Check equipment names, units, safety instructions and interface labels against the source and approved references. Confirm any market-specific document requirements separately.

Provide approved terms and previous translations with the source files. Agree how variants, ambiguous wording and revisions will be reviewed. Terminology maintenance and any termbase handback are confirmed in the project scope. See the 8-step AI + expert workflow.

Working on smart manufacturing documentation?

Include the source and target languages, file types, intended use, deadline and any approved termbase. Agree handling before sending sensitive files. Acknowledged in 4 hours, quoted in 24.

Prepare an inquiry email →Smart Manufacturing solutions →File handling →

A glossary entry is not an official standard or evidence of regulatory acceptance. Confirm current requirements for your project separately.