Clock tree synthesis (CTS) is the physical design process of building a buffered clock distribution network that delivers a clock signal from the source to every sequential element with controlled skew and acceptable latency. In implementation flow documentation, it sits after floorplanning and placement but before routing, and directly impacts timing closure, power consumption, and signal integrity.
Angel Translation editorial reference · Confirm the rendering against your source and approved project terminology.
Check source meaning → confirm the preferred term → record approved variants and references.
The term appears in EDA place-and-route manuals, SoC implementation user guides, timing signoff reports, and training decks. Translators see it in tool dialog options for CTS targets, skew constraints, max transition, clock routing layers, and in design flow diagrams that show the sequence from placement through CTS to routing and timing closure.
One frequent mistake is rendering CTS as 'clock synthesis'—a broader term—or as 'clock tree building' without preserving the synthesis meaning. This hides that the tool is optimizing, not just connecting. In UI localization, inconsistent CTS translations between menus and messages can lead engineers to overlook skew, latency, and max transition settings.
Technical terms need checking against the source, approved product terminology and related specifications. Keep units, parameter conditions and document versions aligned across the file set.
Provide approved terms and previous translations with the source files. Agree how variants, ambiguous wording and revisions will be reviewed. Terminology maintenance and any termbase handback are confirmed in the project scope. See the 8-step AI + expert workflow.
Japanese-to-Chinese documentation for a listed Japanese semiconductor manufacturer.
Read the published project →Corporate reporting and disclosure documentation, delivered across successive annual cycles.
Read the published project →Published scope shows related industry experience; it does not confirm that this specific term was used or reviewed in the project.
Include the source and target languages, file types, intended use, deadline and any approved termbase. Agree handling before sending sensitive files. Acknowledged in 4 hours, quoted in 24.
Prepare an inquiry email →Semiconductor solutions →File handling →A glossary entry is not an official standard or evidence of regulatory acceptance. Confirm current requirements for your project separately.