Static timing analysis is a signoff verification method that checks whether every register-to-register path meets setup and hold constraints by propagating signal arrival times and required times through the timing graph, without logic simulation. In chip implementation and signoff documentation, STA is used across PVT corners to produce timing reports that list slack, critical paths, and violations, and it drives ECO decisions before tape-out.
Angel Translation editorial reference · Confirm the rendering against your source and approved project terminology.
Check source meaning → confirm the preferred term → record approved variants and references.
In localization, STA appears in timing signoff guides, EDA tool reports, design review checklists, and STA methodology manuals. Translators handle STA option labels, report column headers, violation messages, timing constraint file comments, and methodology documents that describe setup/hold checks, clock skew, and timing closure workflows. These strings require consistent terminology across GUI menus, command scripts, and signoff reports.
A frequent error is translating static as '静力' or '静止' rather than emphasizing that no input patterns are simulated. Mistranslating slack, hold, or arrival time terms compounds the issue because STA reports depend on precise timing vocabulary. If the UI and report columns use inconsistent terms, engineers may misread violating paths or signoff margins.
Technical terms need checking against the source, approved product terminology and related specifications. Keep units, parameter conditions and document versions aligned across the file set.
Provide approved terms and previous translations with the source files. Agree how variants, ambiguous wording and revisions will be reviewed. Terminology maintenance and any termbase handback are confirmed in the project scope. See the 8-step AI + expert workflow.
Japanese-to-Chinese documentation for a listed Japanese semiconductor manufacturer.
Read the published project →Corporate reporting and disclosure documentation, delivered across successive annual cycles.
Read the published project →Published scope shows related industry experience; it does not confirm that this specific term was used or reviewed in the project.
Include the source and target languages, file types, intended use, deadline and any approved termbase. Agree handling before sending sensitive files. Acknowledged in 4 hours, quoted in 24.
Prepare an inquiry email →Semiconductor solutions →File handling →A glossary entry is not an official standard or evidence of regulatory acceptance. Confirm current requirements for your project separately.