Coat and Develop Track涂胶显影设备
A coat and develop track processes wafers around lithographic exposure, with modules for operations such as resist coating, baking and developing.
Updated · Angel Translation editorial reference
Check source meaning → confirm the preferred term → record approved variants and references.
Where this term appears
Use the equipment block diagram as the reference for module names. Match the Chinese terms for coat, bake and develop across the recipe screen and maintenance guide. If the track and scanner are linked, keep their separate equipment identifiers in the handoff description.
Translation checks
Keep the track and the exposure scanner separate in equipment lists. Translate the module names as they appear on the actual layout and screen.
Preparing a semiconductor file set for Chinese readers? Prepare terminology and document references →
Keep the term aligned across your files
Technical terms need checking against the source, approved product terminology and related specifications. Keep units, parameter conditions and document versions aligned across the file set.
Provide approved terms and previous translations with the source files. Agree how variants, ambiguous wording and revisions will be reviewed. Terminology maintenance and any termbase handback are confirmed in the project scope. See the 8-step AI + expert workflow.
Related document experience
Torex Semiconductor
Japanese → ChineseJapanese-to-Chinese documentation for a listed Japanese semiconductor manufacturer.
Read the published project →
SMIC (Semiconductor Manufacturing International)
English ⇄ ChineseCorporate reporting and disclosure documentation, delivered across successive annual cycles.
Read the published project →Published scope shows related industry experience; it does not confirm that this specific term was used or reviewed in the project.
Working on semiconductor documentation?
Include the source and target languages, file types, intended use, deadline and any approved termbase. Agree handling before sending sensitive files. Acknowledged in 4 hours, quoted in 24.
Prepare an inquiry email →Semiconductor solutions →File handling →A glossary entry is not an official standard or evidence of regulatory acceptance. Confirm current requirements for your project separately.