Darkfield Inspection暗场检测
Darkfield optical inspection suppresses direct illumination return and collects scattered light to highlight features or defects.
Updated · Angel Translation editorial reference
Check source meaning → confirm the preferred term → record approved variants and references.
Where this term appears
For a darkfield result, keep the mode label and defect-class legend attached to the corresponding wafer map. Do not infer the illumination settings from the displayed image alone. Match the original recipe ID across the report, the user interface and any reinspection instruction.
Translation checks
Keep the two modes separate in inspection settings and result files. Preserve whether the mode is specified by the tool recipe or by the report author.
Preparing a semiconductor file set for Chinese readers? Prepare terminology and document references →
Keep the term aligned across your files
Technical terms need checking against the source, approved product terminology and related specifications. Keep units, parameter conditions and document versions aligned across the file set.
Provide approved terms and previous translations with the source files. Agree how variants, ambiguous wording and revisions will be reviewed. Terminology maintenance and any termbase handback are confirmed in the project scope. See the 8-step AI + expert workflow.
Related document experience
Torex Semiconductor
Japanese → ChineseJapanese-to-Chinese documentation for a listed Japanese semiconductor manufacturer.
Read the published project →
SMIC (Semiconductor Manufacturing International)
English ⇄ ChineseCorporate reporting and disclosure documentation, delivered across successive annual cycles.
Read the published project →Published scope shows related industry experience; it does not confirm that this specific term was used or reviewed in the project.
Working on semiconductor documentation?
Include the source and target languages, file types, intended use, deadline and any approved termbase. Agree handling before sending sensitive files. Acknowledged in 4 hours, quoted in 24.
Prepare an inquiry email →Semiconductor solutions →File handling →A glossary entry is not an official standard or evidence of regulatory acceptance. Confirm current requirements for your project separately.