Aspect ratio compares two dimensions of a feature. For deep trenches or vias, the ratio commonly compares depth with width. Use the measurement convention defined in the drawing or specification.
Updated
Angel Translation editorial reference · Confirm the rendering against your source and approved project terminology.
Check source meaning → confirm the preferred term → record approved variants and references.
A Chinese design guide should identify both dimensions in a ratio, preferably in the same figure or table row. When the source uses a taper, check which width is referenced. If two charts compare different structures, preserve the ratio convention on each chart instead of assuming a shared definition. Keep the ratio and its definition linked if the source repeats them in a process table, figure caption and manufacturing specification.
For a via or trench, retain the numerator and denominator used in the drawing. Translate 深宽比 when the vertical dimension is depth and 高宽比 when it is height.
Preparing a semiconductor file set for Chinese readers? Prepare terminology and document references →
Chinese document application
Illustrative wording only. Confirm the rendering against the actual source and approved project terminology.
The source explicitly specifies which width to use. Keep that datum attached to the ratio.
Match both dimension callouts and datum A against the drawing.
Include the source figure revision, units and definition of where each dimension is measured.
Technical terms need checking against the source, approved product terminology and related specifications. Keep units, parameter conditions and document versions aligned across the file set.
Provide approved terms and previous translations with the source files. Agree how variants, ambiguous wording and revisions will be reviewed. Terminology maintenance and any termbase handback are confirmed in the project scope. See the 8-step AI + expert workflow.
Japanese-to-Chinese documentation for a listed Japanese semiconductor manufacturer.
Read the published project →Corporate reporting and disclosure documentation, delivered across successive annual cycles.
Read the published project →Published scope shows related industry experience; it does not confirm that this specific term was used or reviewed in the project.
Include the source and target languages, file types, intended use, deadline and any approved termbase. Agree handling before sending sensitive files. Acknowledged in 4 hours, quoted in 24.
Prepare an inquiry email →Semiconductor solutions →File handling →A glossary entry is not an official standard or evidence of regulatory acceptance. Confirm current requirements for your project separately.