A scan chain is a serial structure formed by connecting flip-flops or latches into a shift register so test patterns can be loaded and results shifted out. In DFT documentation, scan chains replace normal functional paths during test mode, allowing automatic test equipment to observe and control internal state with a small number of pins.
Angel Translation editorial reference · Confirm the rendering against your source and approved project terminology.
Check source meaning → confirm the preferred term → record approved variants and references.
The term occurs in ATPG user manuals, DFT insertion reports, and silicon bring-up documents. Translators handle scan chain length settings, chain order, stuck-at and transition fault messages, and debugging instructions that mention shifting patterns through scan chains. Terminology consistency in scan insertion menus and test reports is particularly important because engineers rely on chain names.
A common error is to translate as '扫描链路' in one tool and '扫描链' in another, or to use the same term for boundary scan TAP chains and internal scan chains. In test documentation this inconsistency obscures which chain is being loaded, which pins are involved, and what fault model applies.
Technical terms need checking against the source, approved product terminology and related specifications. Keep units, parameter conditions and document versions aligned across the file set.
Provide approved terms and previous translations with the source files. Agree how variants, ambiguous wording and revisions will be reviewed. Terminology maintenance and any termbase handback are confirmed in the project scope. See the 8-step AI + expert workflow.
Japanese-to-Chinese documentation for a listed Japanese semiconductor manufacturer.
Read the published project →Corporate reporting and disclosure documentation, delivered across successive annual cycles.
Read the published project →Published scope shows related industry experience; it does not confirm that this specific term was used or reviewed in the project.
Include the source and target languages, file types, intended use, deadline and any approved termbase. Agree handling before sending sensitive files. Acknowledged in 4 hours, quoted in 24.
Prepare an inquiry email →Semiconductor solutions →File handling →A glossary entry is not an official standard or evidence of regulatory acceptance. Confirm current requirements for your project separately.