Wafer Acceptance Test (WAT)晶圆验收测试
WAT evaluates selected electrical parameters on wafers, often using dedicated test structures, as part of process or acceptance monitoring.
Updated · Angel Translation editorial reference
Check source meaning → confirm the preferred term → record approved variants and references.
Where this term appears
In a translated WAT table, identify the test structure, measured quantity, unit and limits on the same row. If the report gives wafer-level statistics or site-by-site data, preserve that scope. Keep test identifiers intact so the customer can trace a result to its electrical parameter.
Translation checks
Use the approved regional rendering 验收测试 or 允收测试. Distinguish test structures and parameter limits from die-sort bins.
Preparing a semiconductor file set for Chinese readers? Prepare terminology and document references →
Keep the term aligned across your files
Technical terms need checking against the source, approved product terminology and related specifications. Keep units, parameter conditions and document versions aligned across the file set.
Provide approved terms and previous translations with the source files. Agree how variants, ambiguous wording and revisions will be reviewed. Terminology maintenance and any termbase handback are confirmed in the project scope. See the 8-step AI + expert workflow.
Related document experience
Torex Semiconductor
Japanese → ChineseJapanese-to-Chinese documentation for a listed Japanese semiconductor manufacturer.
Read the published project →
SMIC (Semiconductor Manufacturing International)
English ⇄ ChineseCorporate reporting and disclosure documentation, delivered across successive annual cycles.
Read the published project →Published scope shows related industry experience; it does not confirm that this specific term was used or reviewed in the project.
Working on semiconductor documentation?
Include the source and target languages, file types, intended use, deadline and any approved termbase. Agree handling before sending sensitive files. Acknowledged in 4 hours, quoted in 24.
Prepare an inquiry email →Semiconductor solutions →File handling →A glossary entry is not an official standard or evidence of regulatory acceptance. Confirm current requirements for your project separately.