English–Chinese reference · Semiconductor

Kerf切割道宽度

Kerf is the width of material removed from a wafer when it is diced, determined by the saw blade or laser beam and often including chipping or damage zones at the edges. In semiconductor localization, the term appears in dicing process specifications, die size calculations, equipment manuals, and yield documentation where die per wafer, cutting edge quality, and chipping allowances are discussed.

Angel Translation editorial reference · Confirm the rendering against your source and approved project terminology.

TERM REFERENCE · PROJECT CHECK
EnglishKerf
Chinese (Simplified)切割道宽度
DomainSemiconductor

Check source meaning → confirm the preferred term → record approved variants and references.

Where this term appears

Translators encounter kerf in dicing saw recipes, wafer layout spreadsheets, and process change notices. It often appears next to scribe-line and blade width, so maintaining distinct terms is important. In yield modeling documents, kerf loss directly affects gross die counts, and translating it as a generic cut gap can distort the calculation.

Translation checks

A frequent mistake is treating kerf and scribe-line as synonyms because both relate to dicing paths. Scribe-line is the planned spacing; kerf is the actual material removed. In die count calculations, choosing the wrong term can change the estimated number of dies per wafer and mislead yield or cost projections.

Keep the term aligned across your files

Technical terms need checking against the source, approved product terminology and related specifications. Keep units, parameter conditions and document versions aligned across the file set.

Provide approved terms and previous translations with the source files. Agree how variants, ambiguous wording and revisions will be reviewed. Terminology maintenance and any termbase handback are confirmed in the project scope. See the 8-step AI + expert workflow.

Working on semiconductor documentation?

Include the source and target languages, file types, intended use, deadline and any approved termbase. Agree handling before sending sensitive files. Acknowledged in 4 hours, quoted in 24.

Prepare an inquiry email →Semiconductor solutions →File handling →

A glossary entry is not an official standard or evidence of regulatory acceptance. Confirm current requirements for your project separately.