English–Chinese reference · Semiconductor

Kerf切割道宽度

Kerf is the width of material removed by a cut.

Updated · Angel Translation editorial reference

TERM REFERENCE · PROJECT CHECK
EnglishKerf
Chinese (Simplified)切割道宽度
DomainSemiconductor

Check source meaning → confirm the preferred term → record approved variants and references.

Where this term appears

Wafer dicing records may list the measured cut width alongside the planned street width or a separate edge chipping measurement. Match the label to the dimension arrows on the source drawing or inspection image. In revisions, keep a measurement table tied to the figure where the report defines its boundaries.

Translation checks

If the source lists kerf, street width and edge chipping separately, preserve each label, unit and value in the Chinese record. When a spreadsheet uses a generic width heading, check its linked figure before choosing a Chinese term. Keep nominal dimensions and measured results identifiable if the report uses both.

Does the Chinese drawing distinguish kerf from the planned scribe line? Compare the width field, map reference and planned lane in a sample file register →

Keep the term aligned across your files

DISCO: Observation and measurement of processed shape after dicing

Technical terms need checking against the source, approved product terminology and related specifications. Keep units, parameter conditions and document versions aligned across the file set.

Provide approved terms and previous translations with the source files. Agree how variants, ambiguous wording and revisions will be reviewed. Terminology maintenance and any termbase handback are confirmed in the project scope. See the 8-step AI + expert workflow.

Working on semiconductor documentation?

Include the source and target languages, file types, intended use, deadline and any approved termbase. Agree handling before sending sensitive files. Acknowledged in 4 hours, quoted in 24.

Prepare an inquiry email →Semiconductor solutions →File handling →

A glossary entry is not an official standard or evidence of regulatory acceptance. Confirm current requirements for your project separately.